Great Victoria RoofingUnderstand your roof before you hire.

Roofing in Broadmead: Costs, Common Problems and Local Factors

Broadmead's 1980s and 90s homes were built into protected oak and fir, and many still carry cedar shake. Why it is Saanich's mossiest neighbourhood.

Greater Victoria dataIndependent, no contractor commissions on adviceSources and methodology on every page

Quick answer

Converting an original cedar shake roof on a 2,400 sq ft two-storey Broadmead home to laminate asphalt costs about $8,700 to $15,900 before GST in our pricing model with the sloped-lot access factor included, plus sheeting over the skip sheathing at $7 to $10 per sq ft where needed. Broadmead was built in the 1980s and 90s under design covenants that kept the Garry oak and Douglas fir standing, and thirty years on those protected trees make it the mossiest neighbourhood in Saanich and put many of its first roofs, a large share of them cedar, at the end of their lives together.

Housing era
Mostly 1980s–1990s; many roofs at or past first replacement
Two-storey, 2,400 sq ft, moderate access
$8,700–$15,900 before GST
Two-storey, 2,000 sq ft, cedar to cedar
$17,600–$35,300 before GST
Tree cover
Heavy, protected by covenant

Next step: Uses your postal code and home details.

Get My Local Roof Estimate

Key facts

Housing era
Mostly 1980s–1990s; many roofs at or past first replacement
Source: Statistics Canada
Two-storey, 2,400 sq ft, moderate access
$8,700–$15,900 before GST
Our pricing model (estimate)
Two-storey, 2,000 sq ft, cedar to cedar
$17,600–$35,300 before GST
Our pricing model (estimate)
Tree cover
Heavy, protected by covenant
Our estimate
Rainfall
Sheltered; moderate rainfall
Source: Environment and Climate Change Canada
Saanich inspections
250-475-5457 / inspections@saanich.ca
Source: District of Saanich

Broadmead context

Broadmead was planned in the 1980s as a neighbourhood in a forest: building schemes required that Garry oaks and Douglas fir be retained, houses were fitted between them on sloped lots, and a notable share were roofed in cedar shake to match. Three decades later the trees are bigger, the shade is deeper, and the roofs installed in 1988 or 1994 are all coming due within a few years of each other. That is the Broadmead pattern: a whole neighbourhood of first replacements, many of them cedar-to-asphalt conversions, all under a canopy that the covenants will not let anyone remove.

Compared with Gordon Head, which is open and flat with tar-and-gravel sections, Broadmead is shaded, sloped and pitched. Tree protection zones and terraced lots limit where a bin and boom truck can stand, which pushes the access factor up. Rainfall is moderate and the neighbourhood is sheltered from the strait, so salt and wind are not issues. Moss is the issue, and the covenant means the answer has to be maintenance and material rather than cutting the trees down.

Broadmead local knowledge pack
FactorWhat we see in BroadmeadBasis
Housing ageMostly 1980s–1990s; many roofs at or past first replacement.Statistics Canada
Common roof typesLaminate asphalt; a notable share of cedar shake from original construction.Our local characterisation
Tree coverHeavy, protected by covenant.Our local characterisation
Moss exposureHigh.Our local characterisation
Salt exposureLow.Our local characterisation
AccessSloped lots and tree protection zones limit bin and truck placement.Our local characterisation
Lot sizeMedium to large.Our local characterisation
Weather exposureSheltered; moderate rainfall.Environment and Climate Change Canada
Common projectsCedar-to-asphalt conversions, moss-driven replacements, valley rebuilds.Our local characterisation
PermitsDistrict of Saanich permit rules apply; check any building-scheme covenants on material.District of Saanich

Exposure profile — moss 3/3 · wind 1/3 · salt 1/3 · trees 3/3. Area price factor: 1.00 (No municipality-level price difference is supported by evidence; site access, pitch and tree cover are priced per home instead.)

Typical roofing projects in Broadmead (our estimate, before GST)
ProjectWhy it is common hereTypical range
Cedar-to-asphalt conversionOriginal 1980s–90s shakes at end of life$8,700–$15,900 (2,400 sq ft, two storeys) plus sheeting over skip sheathing
Cedar-to-cedar replacementOwners keeping the neighbourhood look$17,600–$35,300 (2,000 sq ft, two storeys)
Moss removal and treatmentHeavy protected canopy over every slope$400–$1,200
Valley rebuildDebris-filled valleys on multi-gable 1990s designsIncluded in replacement; $400–$1,500 as a repair
Sloped-lot access surchargeTree protection zones and terraced driveways5–12% on the replacement subtotal
Zinc or copper strip installationKeeping a new roof clean under covenant trees$300–$600 (Victoria contractor guide, 2026)

Our pricing model except the strip figure, which is a published 2026 local contractor range.

Estimated asphalt shingles replacement cost by home size
Home size (floor area)Approx. roof areaEstimated rangePer sq ft of roof
1,000 sq ft600 sq ft$3,500 – $6,300$5.5–$10
1,500 sq ft899 sq ft$5,200 – $9,400$5.5–$10
2,000 sq ft1,199 sq ft$6,900 – $12,600$5.5–$10
2,500 sq ft1,499 sq ft$8,700 – $15,700$5.5–$10
3,000 sq ft1,799 sq ft$10,400 – $18,900$5.5–$10

Our estimate from the Great Victoria Roofing pricing model (reviewed 2026-09-10); 2-storey home, moderate pitch, one layer, sound decking, easy access. Before 5% GST. Not a quotation.

How Broadmead differs from the rest of Saanich

Saanich as a whole is a moss story spread across 1950s to 1980s houses; Broadmead is that story concentrated into one decade of construction and one decision about trees. The covenants that make the neighbourhood attractive also mean the shade is permanent, so a Broadmead re-roof is a decision about how to live under trees for the next 25 years rather than a one-off repair. The high share of original cedar is the other difference: a Gordon Head roofer prices torch-on sections, a Broadmead roofer prices sheeting over skip sheathing.

Cedar to what?

An original Broadmead shake roof sits on spaced skip sheathing, so any conversion to asphalt or metal starts with solid decking: either plywood over the existing boards or a full re-sheet, priced at $7 to $10 per sq ft in our model. From there the options are a shake-profile laminate at roughly half the price of new cedar, a synthetic shake, or metal. Going back to cedar keeps the streetscape but a BC guide puts maintained cedar at 18 to 25 years and unmaintained at 12 to 15, and Broadmead shade is hard on it. Check the building scheme covenant on your title for any material requirement before deciding.

  • Sheeting over skip sheathing: $7–$10 per sq ft
  • Shake-profile laminate: half the cost of cedar
  • Synthetic shake: mid price, low maintenance
  • Metal: sheds needles, no moss, 40–50 year local life
  • Covenant check for material restrictions

Ready to see your own number? Uses your postal code and home details.

Get My Local Roof Estimate

Living under covenant trees

Because the canopy cannot be removed, the maintenance plan matters more here than anywhere in Saanich. Local guides put the highest moss risk on north slopes under fir and cedar and suggest treatment every 12 to 18 months; in Broadmead a yearly clean before the November rains is realistic. Zinc or copper strips at the ridge protect roughly 15 feet of slope below them, and a Victoria contractor guide prices strips at $300 to $600 installed. Never allow pressure washing on asphalt or cedar.

Permits and the sloped-lot quote

Broadmead is under District of Saanich rules: the Permit Q&A does not list roofing as exempt or required, so phone Inspection Services at 250-475-5457 or email inspections@saanich.ca, and ask about the material change from cedar and about any re-sheeting. Also ask any contractor where the bin and truck will sit; on a terraced lot with a tree protection zone, that answer is worth several hundred dollars either way.

Frequently asked questions

Should I replace my cedar shake roof with cedar again or switch?

In Broadmead shade, cedar needs yearly attention to reach 18 to 25 years and costs roughly double a shake-profile laminate. Most conversions go to laminate or metal; check your building scheme covenant first for any material requirement.

Do I need a building permit to re-roof in Broadmead?

District of Saanich rules apply and the permit Q&A does not mention roofing either way. Confirm with Inspection Services at 250-475-5457, especially for a change from cedar and for re-sheeting.

How much do zinc or copper strips cost installed?

A Victoria contractor guide from 2026 quotes $300 to $600. They protect about 15 feet of roof below the strip, so a long Broadmead slope may need two. Copper stays active longer than zinc.

Can I pressure wash my roof to remove moss?

No. University extension guidance for the Pacific Northwest is clear that pressure washing strips granules from asphalt and damages cedar. Moss should be brushed or scraped off gently and then treated.

Is it cheaper to repair or replace my roof?

If a 1990s Broadmead cedar roof has thin, split shakes across most slopes, repairs chase leaks and replacement is the better spend. If one shaded slope is failing and the rest has thickness left, a section repair at $800 to $2,500 in our model may buy time.

Sources

  1. Census Profile, 2021 Census — period of constructionStatistics Canada, accessed 2026-09-10.
  2. Canadian Climate Normals 1991–2020 — Victoria stationsEnvironment and Climate Change Canada, accessed 2026-09-10.
  3. Permit Q&AsDistrict of Saanich, accessed 2026-09-10.
  4. Great Victoria Roofing pricing model (our estimate)Great Victoria Roofing, accessed 2026-09-10.
  5. Preventing roof moss in Victoria BCShoreline Roofing (Victoria contractor) (contractor/commercial estimate), accessed 2026-09-10.
  6. Cedar shake roofing guide (Surrey BC)Paragon Roofing BC (contractor/commercial estimate), accessed 2026-09-10.
  7. How to control roof moss and prevent long-term damageOregon State University Extension, accessed 2026-09-10.
  8. Zinc strips for roof moss — Miller Library Q&AUniversity of Washington Botanic Gardens, accessed 2026-09-10.

Full list with what each source supports: Sources · How we build estimates: Methodology

Last reviewed · Editorial team — reviewed against the sources listed on each page · Cost figures are estimates from our published pricing model, not quotations.

Request local roofing quotes

We share your details only with a local roofing provider you ask us to contact. No spam, no call lists.

Take the next step with confidence

Uses your postal code and home details.

Get My Local Roof Estimate
EstimateRequest Help